Membrane structure parking sheds are very common in life. The parking sheds made of this material are suitable for various occasions, whether it is a residential parking shed or a shopping mall parking shed, and the membrane structure parking shed needs to be used during installation. For many materials and tools, its installation steps are also more complicated. Next, we will take a closer look.膜结构13

Tools for installing membrane structure parking sheds

The materials and tools selected for the installation of the parking shed, if it is a membrane structure car shed, are the steel frame, steel frame paint, fasteners, selected membrane cloth, tools for tensioning the membrane cloth, etc. The installation of the membrane structure of the parking shed membrane structure includes four parts: the expansion of the membrane body, the connection and fixing, the hoisting in place and the tension forming, so it requires a lot of materials and tools during installation.

Operation of installing membrane structure parking shed

1.Before unfolding the membrane body of the membrane structure carport, lay a temporary cloth on the platform to protect the membrane material from damage and clean the membrane material, and unfold the membrane body in strict accordance with the determined order. Before opening the package, check the mark on the package, confirm the installation location, and unfold it in the direction of the mark, and try to avoid the unfolded film body from moving in the field.

2. Before the membrane surface is unfolded, the fastened plywood should be installed first. The spacing of the plywood should not be greater than 2m. According to the span of the membrane structure, adjust the spacing of the center of the plywood. The bolts and nuts of the plywood must be tightened in place. For the membrane body that is hoisted in place at one time, the splint bolts and nuts must also be tightened in place at one time.

3. At present, the multi-point overall lifting method is mostly used in the hoisting of the cable-membrane structure, which is to transform the mature overall "lifting" technology into the construction process of the flexible structure of the cable-membrane structure. The process requires that the entire process must be synchronized. During the hoisting process, the ascending speed and distance of each hoisting point are controlled to ensure uniform force transmission on the membrane surface.

4. The membrane structure carport can also be hoisted in blocks, and the membrane body is divided into several operation blocks according to the plane position.

5. Tension forming is an important link in the construction of the entire membrane structure project. Whether the construction project can achieve results depends on whether the tension meets the design requirements. When the support structure is a rigid boundary, the application of the prestressing force is carried out by means of a special construction. For flexible boundaries, the prestress can be adjusted by adjusting the position of the struts.