page_head_Bg

Products

Hello, come to consult our products !

2022 China New Design Parking Roof - Membrane structure processing – Puye


Product Detail

Product Tags

Related Video

Feedback (2)

go on to boost, to be certain item quality in line with market and buyer standard demands. Our firm has a excellent assurance procedure happen to be established for Space Frame Structures Examples, Space Frame Structure Details, Tensile Parking Shed, We sincerely welcome friends from all over the world to cooperate with us on the basis of long-term mutual benefits.
2022 China New Design Parking Roof - Membrane structure processing – Puye Detail:

Membrane structure processing and production process:

Membrane structure processing and production process:

1. After the membrane material is inspected, it should be transported into the clean workshop that has been dedusted.

2. Sampling 20 sets of diaphragm and back sticker samples, using a 60mm wide splicing knife to determine 4 groups of different splicing temperatures, currents, and pressing time. For the connection data of force and appearance, fill in the determined data and paste it on the connection machine, and the diaphragm connection is connected according to the data in this table.

3. The blanking of the diaphragm must go through three procedures in sequence: read the coordinates of the cutting design, take the point; review the coordinates, draw the material line; review the coordinates, drop the knife and blank the material. Then stick a numbered label and lift it to the stakeout area.

4. In the staking area, staking out all the diaphragms of the membrane unit that has been unloaded, and then draw the stitching line after checking. Use a soft cotton cloth when wiping the seam membrane and backing strip.

5. When connecting the machine, the back sticker is set on the bottom surface of the film. After the diaphragm and the connecting knife are centered, the diaphragm is flattened and stabilized, so that the diaphragm does not move during the high-frequency connection process.

6. The overweight membrane unit should be subdivided when splicing, and finally the splicing seam will be moved with a small crane and the membrane will be folded and packaged.

Specification:

describe:

1.Material: 100% polyester..
2. Finish: Use PVC coated tarpaulin.
3. Dimension: Diversity design, according to customer’s requirements.

Membrane structure processing site:

Membrane structure processing site
Membrane structure processing site
Membrane structure processing site


Product detail pictures:

2022 China New Design Parking Roof - Membrane structure processing – Puye detail pictures

2022 China New Design Parking Roof - Membrane structure processing – Puye detail pictures

2022 China New Design Parking Roof - Membrane structure processing – Puye detail pictures

2022 China New Design Parking Roof - Membrane structure processing – Puye detail pictures


Related Product Guide:

We have advanced equipment. Our products are exported to the USA, the UK and so on, enjoying a good reputation among customers for 2022 China New Design Parking Roof - Membrane structure processing – Puye , The product will supply to all over the world, such as: India, Venezuela, United Arab emirates, Today, We are with great passion and sincerity to further fulfill our global customers' needs with good quality and design innovation. We fully welcome customers from all over the world to establish stable and mutually beneficial business relationships, to have a bright future together.
  • Managers are visionary, they have the idea of "mutual benefits, continuous improvement and innovation", we have a pleasant conversation and Cooperation.
    5 Stars By Joyce from Honduras - 2017.09.16 13:44
    The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By Eileen from Bahamas - 2018.02.12 14:52