page_head_Bg

Products

Hello, come to consult our products !

2022 High quality Fabric Tensile - Membrane structure processing – Puye


Product Detail

Product Tags

Related Video

Feedback (2)

We have quite a few great team customers very good at internet marketing, QC, and dealing with kinds of troublesome trouble while in the output approach for Parking Roof, Tensile Roof Material, Triple Layer Grid Space Frame, We welcome new and previous clients from all walks of lifetime to get in touch with us for future small business interactions and mutual success!
2022 High quality Fabric Tensile - Membrane structure processing – Puye Detail:

Membrane structure processing and production process:

Membrane structure processing and production process:

1. After the membrane material is inspected, it should be transported into the clean workshop that has been dedusted.

2. Sampling 20 sets of diaphragm and back sticker samples, using a 60mm wide splicing knife to determine 4 groups of different splicing temperatures, currents, and pressing time. For the connection data of force and appearance, fill in the determined data and paste it on the connection machine, and the diaphragm connection is connected according to the data in this table.

3. The blanking of the diaphragm must go through three procedures in sequence: read the coordinates of the cutting design, take the point; review the coordinates, draw the material line; review the coordinates, drop the knife and blank the material. Then stick a numbered label and lift it to the stakeout area.

4. In the staking area, staking out all the diaphragms of the membrane unit that has been unloaded, and then draw the stitching line after checking. Use a soft cotton cloth when wiping the seam membrane and backing strip.

5. When connecting the machine, the back sticker is set on the bottom surface of the film. After the diaphragm and the connecting knife are centered, the diaphragm is flattened and stabilized, so that the diaphragm does not move during the high-frequency connection process.

6. The overweight membrane unit should be subdivided when splicing, and finally the splicing seam will be moved with a small crane and the membrane will be folded and packaged.

Specification:

describe:

1.Material: 100% polyester..
2. Finish: Use PVC coated tarpaulin.
3. Dimension: Diversity design, according to customer’s requirements.

Membrane structure processing site:

Membrane structure processing site
Membrane structure processing site
Membrane structure processing site


Product detail pictures:

2022 High quality Fabric Tensile - Membrane structure processing – Puye detail pictures

2022 High quality Fabric Tensile - Membrane structure processing – Puye detail pictures

2022 High quality Fabric Tensile - Membrane structure processing – Puye detail pictures

2022 High quality Fabric Tensile - Membrane structure processing – Puye detail pictures


Related Product Guide:

Sticking to the belief of "Creating products of high quality and making friends with people from all over the world", we always put the interest of customers in the first place for 2022 High quality Fabric Tensile - Membrane structure processing – Puye , The product will supply to all over the world, such as: Turkey, Stuttgart, Sevilla, With the technology as the core, develop and produce high-quality merchandise according to the diverse needs of the market. With this concept,the company will continue to develop merchandise with high added values and continuously improve items,and will present many customers with the best goods and services!
  • Adhering to the business principle of mutual benefits, we have a happy and successful transaction, we think we will be the best business partner.
    5 Stars By Nydia from Malawi - 2018.06.05 13:10
    This is a very professional and honest Chinese supplier, from now on we fell in love with the Chinese manufacturing.
    5 Stars By Renata from European - 2018.06.26 19:27