page_head_Bg

Products

Hello, come to consult our products !

Factory Outlets Space Frame Structure Model - Construction Of 126-Meter Space Frame Span Project Of Steel Space Frame Power Plant – Puye


Product Detail

Product Tags

Related Video

Feedback (2)

Our enhancement depends around the sophisticated devices ,exceptional talents and repeatedly strengthened technology forces for Tensile Roof, Metal Truss Design, Steel Frame Manufacturers, We welcome you to definitely inquire us by simply call or mail and hope to develop a prosperous and cooperative connection.
Factory Outlets Space Frame Structure Model - Construction Of 126-Meter Space Frame Span Project Of Steel Space Frame Power Plant – Puye Detail:

/grid-copy-number-review-finished-product-packaging-product/

This project is a semi-circular industrial space frame / height 55 meters / total length 900 meters / total span 65 meters.

1. Both ends of all steel pipes should be closed, and sealing plates should be installed before they are closed to prevent corrosion in the pipes.

2. The finished components should be powered by rust removal, so that the surface of the steel exposes the metallic color, the rust removal grade is not lower than Sa2.5, and the rust removal quality should meet the relevant requirements of GB8923.

3. After the steel is derusted, two coats of 80μm epoxy zinc-rich primer, one 70μm epoxy micaceous iron intermediate paint, and fire retardant paint are applied. The fire resistance grade of this project is two, the non-intumescent fireproof coating is 25mm, and the fire resistance time limit is 1.5h. Fire retardant coatings must have a test report and a production license approved by the national testing agency for their fire resistance. The quality and construction of the fire retardant coatings used shall meet the requirements of “Technical Specifications for Fire Protection of Building Steel Structures” (CECS200:2006) and “Fireproof Coatings for Steel Structures” (GB14907-2002).

4. Structural components should be maintained regularly. Within the design service life of the main structure, the maintenance cycle of the surface coating of the steel structure components that have been technically identified and approved for use should not be longer than the nominal service life of the products used; Damaged paint films of structural components should be repainted in time.

5. When the grid frame is maintained around, it should be connected with the original structure to balance the horizontal force.

Construction of 126-meter span project of steel space grid power plant
Construction of 126-meter span project of steel space grid power plant
Construction of 126-meter span project of steel space grid power plant


Product detail pictures:

Factory Outlets Space Frame Structure Model - Construction Of 126-Meter Space Frame Span Project Of Steel Space Frame Power Plant – Puye detail pictures

Factory Outlets Space Frame Structure Model - Construction Of 126-Meter Space Frame Span Project Of Steel Space Frame Power Plant – Puye detail pictures

Factory Outlets Space Frame Structure Model - Construction Of 126-Meter Space Frame Span Project Of Steel Space Frame Power Plant – Puye detail pictures


Related Product Guide:

We have been commitment to supply the competitive price ,excellent products and solutions high-quality, at the same time as fast delivery for Factory Outlets Space Frame Structure Model - Construction Of 126-Meter Space Frame Span Project Of Steel Space Frame Power Plant – Puye , The product will supply to all over the world, such as: Australia, Afghanistan, Swaziland, Company name, is always regarding quality as company' s foundation, seeking for development via high degree of credibility , abiding by ISO quality management standard strictly, creating top-ranking company by spirit of progress-marking honesty and optimism.
  • It is not easy to find such a professional and responsible provider in today's time. Hope that we can maintain long-term cooperation.
    5 Stars By Fiona from El Salvador - 2018.09.19 18:37
    The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
    5 Stars By Hellyngton Sato from Roman - 2017.02.18 15:54